Analisis Penjadwalan Ulang Proyek dengan Building Information Modelling Pada Pembangunan Gedung Graha Pemuda Kompleks Katedral Jakarta
DOI:
https://doi.org/10.31004/jptam.v7i3.10834Keywords:
Penjadwalan, Durasi, Building Information Modelling (Bim), NavisworksAbstract
References
Abrar, H. (2011). Manajemen Proyek, Perencanaan, Penjadwalan, Pengendalian Proyek.
Achmad Siddiq, R. K. (2022, Desember 2). ANALISIS PENJADWALAN MENGGUNAKAN APLIKASI MICROSOFT PROJECT 2010 (STUDI KASUS: RUANG TERBUKA HIJAU (RTH) KABUPATEN WAJO). JURNAL KARAJATA ENGINEEING.
Andiyan. (n.d.). PENERAPAN BIM UNTUK SISTEM PENJADWALAN PROYEK DENGAN MODEL 4D DAN ESTIMASI BIAYA MODEL 5D.
Henry, G., Supani, & Adi, T. J. (2020). Perencanaan Penjadwalan dengan Aplikasi BIM Menggunakan Analisa Probabilistik (Studi Kasus Proyek Jembatan Bedadung). JURNAL TEKNIK ITS Vol. 9, No. 1.
Hilman, D., Maskur, A., & Saepudin, U. (n.d.). ANALISIS PENJADWALAN PROYEK DENGAN PROGRAM MICROSOFT PROJECT 2019. Jurnal Ilmiah Teknik Sipil.
Ricardoegan, K., Indrastuti, & Savitri, A. (2022). ANALISIS PENERAPAN BUILDING INFORMATION MODELING (BIM) DAN KINERJA WAKTU PADA PROYEK PEMBANGUNAN STRUKTUR REKTORAT UNIVERSITAS INTERNASIONAL BATAM. Rekayasa Jurnal Teknik Sipil Universitas Madura.
Tamba, S., & Hutauruk, D. M. (2018, Maret 1). Optimasi Biaya Dan Waktu Akibat Penjadwalan Ulang Proyek Perumahan Menggunakan Microsoft Project. Journal of Civil Engineering, Building and Transportation.
Downloads
Published
How to Cite
Issue
Section
Citation Check
License
Copyright (c) 2023 Alya Putri Octavia
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work’s authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal’s published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).