Analisis Manajemen Konstruksi pada Pembangunan Gudang PT. PJPT Senopati
DOI:
https://doi.org/10.31004/jptam.v8i1.12571Keywords:
Construction Management, Warehouse, Cost Management, ScheduleAbstract
References
Agustin, Septian & Firmanto, Arief. 2017. Analisis Manajemen Konstruksi Pembangunan Ruko dan Gudang Mitra 10 Lampung, 6(6): 557-563
Chasanah, Ummi & Sulistyowati. 2017. Penerapan Manajemen Konstruksi Dalam Pelaksanaan Konstruksi, 3(1): 35-39
Kiswati, Sri & Chasanah, Ummi. 2019. Analisis Konsultan Manajemen Konstruksi Terhadap Penerapan Manajemen Waktu Pada Pembangunan Rumah Sakit di Jawa Tengah, 5(1)
Nugraha, Adham & Sunarman. 2017. Analisis Manajemen Konstruksi Pembangunan Kantor Samsat Cabang Pelayanan Provinsi Di Wilayah Majalengka Kab. Majalengka, 5(3): 239-252
Putra, dkk. 2020. Analisa Waktu Dan Biaya Proyek Konstruksi Pembangunan Gedung
Gudang Dan Kantor PT ABC Semarang Dengan Earned Value Analysis: 101-126
Sanpura, Adrian & Wijayanti, Anita. Analisis Rencana Anggran Biaya (RAB) Proyek Sebagai Alat Perencanaan Dan Pengendalian Biaya (Studi Kasus Pada PT. Griya Sentosa Property), 4(1)
Suryawan, dkk. 2023. Analisis Manajemen Konstruksi Proyek Pada Pembangunan Gudang Baja Di Kenjeran, Surabaya, 2(1): 22-32
Tanubrata, Maksum & Lukman, Marco. 2011. Sistem Informasi Penjadwalan dan Pengendalian Biaya Proyek Konstruksi, 7(2): 146-158.
Tanjung, dkk. 2021. Analisis Manajemen Proyek Pada Proyek Pembangunan Gudang Arsip Dinas Kesehatan Provinsi Riau Menggunakan Metode Critical Path Method (CPM): 125-129
Downloads
Published
How to Cite
Issue
Section
Citation Check
License
Copyright (c) 2024 Muhammad Fadhlurrahman
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work’s authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal’s published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).